So I realized it’s been awhile. Lots of work has been happening. I’m living in the house! If you haven’t seen the other updates, here’s the link. ...Kinja is being dumb again, so everything is just going to be in the image caption. Oh well.

Grouting the kitchen floor. Wasn’t scary at all. But I love the black grout now that it’s done.
Office with paint, but before window trim.
Guest room.
Facing the other way in guest room. These were two rooms, and we took down the wall betweem them.

Advertisement

Hallway, from the guest room looking out to the living room.
Living room.
Living room, with the front door. No one really uses it, the driveway and garage are on a different side of the house.

Advertisement

Fireplace in the breezeway that connects the garage to the house.
Totally done!
Almost done, there is now a microwave above the range.

Advertisement

Floor in the breezeway needed a layer of self-leveling cement to cover up the heating element. It’s the only source of the heat for the room. (I realize there’s a fireplace, I have no intention to use it...)
Tile going in... it’s still not done... sigh.
Scary bathroom before. Notice the slanted floor and slab to make the toilet level.

Advertisement

Walls torn out and fixtures gone.
Cleaned up. Next up is tearing out the floor. And then replacing the entire sewer and water lines out to the main city lines. The sewer lines are the clay tile from 1940 and are collapsed and full of tree roots. I’m also rearranging the bathroom so everything has to move anyways.
The bedroom walls have studs so we can have spray insulation done. Still need to do the living/tv room... and then the plumbing and electric...

Advertisement

The photos of the main floor are outdated, but still an update from my last post. The window trim, base board and quarter round has all been added and I hung curtains in all the rooms. I’m still trying to unpack and take final pictures. But instead I went to Daytona for the 24 Hour and now I have a cold.