Just about done with this part of the build, I just need to weld up some trailing arm adapters on Sunday. Then it is all done. Brake lines have been run and bled and steering has been connected.

I already bought the 2JZ that will be taking the place of the old 300 but I am going to throw in a 4 link/coilovers in the rear before we get to that.