I was hired by a builder to do drawings for an addition. Hes been setting meetings and cancelling them for about the last 2 MONTHS. Finally he said he could meet but it would have to be 6:30am. At least he paid me what he owed me to date, but not what he was supposed to pay me to get the next phase going.

the starting point:

Proposed: